| Mineralized Zones: SlideThe Slide area lies near the northeastern margin of the Duckling Creek Complex, on the north side of Haha Creek.
Six widely spaced diamond drill holes, totalling 1,603.6 metres, were completed in the Slide Zone in 2007 to follow up on the successful drill testing completed in the 2006 program. Drilling continued to intersect good copper values in this area and intersected multiple bands of mineralization, indicating that further drill testing is warranted. A summary of selected results from the 2006 and 2007 program are outlined in the following table. Please note that true thicknesses are not known for the drill intercepts shown in the table and these intercepts are simply core lengths.
Drill Results
| Hole No. |
From (m) |
To (m) |
Intercept (m) |
Cu (%) |
Au (g/t) |
Ag (g/t) |
| JTM-07-11 |
21.3 |
37.3 |
16 |
0.66 |
0.045 |
4.2 |
JTM-07-12 including and and and |
67.9 67.9 133.1 204.5 284.5 |
154.5 103.4 154.5 205.8 327.6 |
86.6 35.5 21.4 1.3 43.1 |
0.35 0.67 0.28 2.39 0.59 |
- 0.09 0.07 0.67 0.06 |
2.1 4.1 1.5 14.7 4.7 |
| JTM-07-13 |
249.2 |
251.1 |
1.9 |
1.51 |
0.178 |
7.2 |
JTM-07-14 including |
56 124.6 |
66 126.2 |
10 1.6 |
0.24 1.67 |
- 0.07 |
1.5 7.2 |
| JTM-07-15 |
171.3 |
202 |
30.7 |
0.61 |
0.1 |
3.2 |
| JTM-07-15a |
Hole lost: no sampling |
JTM-06-7 including |
148.2 261.5 |
154.6 317 |
6.4 55.5 |
0.53 0.72 |
- 0.07 |
2.4 5.5 |
| JTM-06-8 |
107.1 |
109.3 |
2.2 |
1.15 |
0.386 |
7.6 |
JTM-06-9 including and |
73.6 112.3 263.9 |
79.7 116.6 265.7 |
6.1 4.3 1.8 |
0.31 1.63 0.44 |
- 0.095 - |
3.8 3.7 23.2 |
JTM-06-10 including and and |
26.4 26.4 74.4 97.3 |
97.3 36.4 97.3 100.1 |
70.9 10 22.9 2.8 |
0.26 0.28 0.64 0.088 |
- - 0.15 - |
10.5 3.3 30 76.7 |
| |